💧 Speck BADU Resort 80 4.00kW 3-Phase Commercial Pool Pump
Professional-Grade German Engineering – High-Capacity Circulation for Demanding Commercial Environments
📋 Product Overview
The Speck BADU Resort 80 delivers exceptional commercial pool circulation with a powerful 4.00kW (5.5 HP) three-phase motor engineered for demanding aquatic installations. This German-manufactured pump provides flow rates up to 80 m³/h – performance traditionally requiring expensive, heavy bronze or cast-iron equipment – while offering significantly lower investment costs and simplified maintenance.
Constructed from advanced fibreglass-reinforced composite materials, the Resort 80 provides complete corrosion immunity, substantial weight reduction compared to metal alternatives, and the legendary reliability of German precision engineering. The innovative maintenance-free bellows mechanical seal ensures complete electrical separation between the motor shaft and pool water, exceeding commercial safety standards for public installations.
Configured specifically for 690/400V three-phase systems, this pump is ideally suited for medium-to-large commercial pools in the 350-400 cubic metre range, including hotels, wellness centres, health clubs, municipal facilities, and prestigious private estates requiring commercial-grade circulation capacity.
⭐ Key Features
✅ 4.00kW (5.5 HP) Three-Phase Power – Robust 690/400V motor delivering approximately 2840 RPM for exceptional flow rates up to 80 m³/h
✅ High-Capacity Flow Performance – Approximately 80 m³/h at 10m head, with maximum head capacity up to 18m for demanding hydraulic layouts
✅ Advanced Self-Priming Technology – Install up to 3 metres above or below water level, providing complete flexibility for equipment room positioning
✅ Maintenance-Free Closed Bellows Mechanical Seal – Carbon/ceramic/NBR construction eliminates routine seal maintenance and reduces long-term costs
✅ Complete Electrical Separation – Motor/pump shaft has no contact with pool water via plastic shaft protector sleeve, exceeding commercial safety requirements
✅ Oversized Integrated Strainer Basket – Approximately 3-litre capacity with 3.2×2.6mm mesh dramatically extends cleaning intervals
✅ Premium Reinforced Composite Construction – PP GF 30 pump casing and PA 66 GF impeller provide complete corrosion immunity and UV stability
✅ TÜV Rheinland GS Certified – German safety certification to EN 60335-1 standards for commercial compliance
✅ IP55 Motor Protection – Class F insulation with thermal overload safety for demanding continuous-duty operation
✅ Compact Monoblock Design – Integrated construction minimises leak points and simplifies both installation and maintenance
🔧 Technical Specifications
| Specification | Details |
|---|---|
| Model | Speck BADU Resort 80 |
| Power Output (P2) | 4.00 kW (5.5 HP) |
| Power Input (P1) | 4.80 kW |
| Phase Configuration | 3-Phase |
| Voltage | 690/400V (Y/Δ Connection) |
| Rated Current | 4.50/7.80 A (Y/Δ) |
| Motor Speed | Approximately 2840 RPM |
| Flow Rate @ 10m Head | Approximately 80 m³/h |
| Maximum Head Capacity | Up to 18m |
| Recommended Pool Size | 350-400 m³ |
| Maximum Water Temperature | 60°C |
| Maximum Casing Pressure | 2.5 bar |
| Installation Range | Up to 3m above or below water level |
| Recommended Inlet/Outlet Pipe | 140/140 mm |
| Strainer Basket Capacity | Approximately 3 litres |
| Strainer Mesh Size | 3.2 × 2.6 mm |
| Motor Protection | IP55 with Thermal Overload |
| Insulation Class | Class F |
| Continuous Sound Level | ≤70 dB(A) |
| Pump Casing Material | PP GF 30 (Polypropylene Glass-Filled) |
| Impeller Material | PA 66 GF (Polyamide Glass-Filled) |
| Hardware | Stainless Steel |
| Weight | 34 kg |
| Pump Length | 867 mm |
| Safety Certification | TÜV Rheinland GS (EN 60335-1) |
💰 Usage Costs & Running Expenses
📊 Annual Running Cost Calculation
Understanding the true cost of ownership is essential when investing in high-capacity commercial pool equipment. Here’s a detailed breakdown of the Resort 80’s operating costs:
Base Power Consumption:
- Power Input (P1): 4.80 kW
- UK Commercial Electricity Rate: £0.26 per kWh (November 2025 average)
🏊 Scenario 1: Seasonal Commercial Pool (Hotel/Resort)
Usage Pattern: 10 hours per day, 6 months (180 days)
| Calculation Component | Value |
|---|---|
| Daily running hours | 10 hours |
| Operating season | 180 days |
| Annual running hours | 1,800 hours |
| Power consumption | 4.80 kW |
| Energy consumed | 8,640 kWh |
| ✅ Annual running cost | £2,246.40 |
Monthly cost during operation: £374.40
♨ Scenario 2: Year-Round Commercial Operation (Wellness Centre/Municipal Pool)
Usage Pattern: 12 hours per day, 365 days
| Calculation Component | Value |
|---|---|
| Daily running hours | 12 hours |
| Operating days | 365 days |
| Annual running hours | 4,380 hours |
| Power consumption | 4.80 kW |
| Energy consumed | 21,024 kWh |
| ✅ Annual running cost | £5,466.24 |
Monthly cost: £455.52
🏢 Scenario 3: Health Club/Leisure Centre Extended Operation
Usage Pattern: 14 hours per day, 300 days
| Calculation Component | Value |
|---|---|
| Daily running hours | 14 hours |
| Operating days | 300 days |
| Annual running hours | 4,200 hours |
| Power consumption | 4.80 kW |
| Energy consumed | 20,160 kWh |
| ✅ Annual running cost | £5,241.60 |
Monthly cost during operation: £524.16
⚡ Energy Efficiency Comparison
The Resort 80’s advanced engineering delivers exceptional value when compared to traditional high-capacity alternatives:
| Pump Type | Typical Power | Annual Cost (1,800 hrs) | Difference |
|---|---|---|---|
| ❌ Traditional Bronze Pump (80m³/h class) | 5.5-6.0 kW | £2,574 – £2,808 | +£328 to +£562 |
| ❌ Cast Iron Norm Pump | 5.2-5.8 kW | £2,434 – £2,714 | +£188 to +£468 |
| ✅ Speck Resort 80 | 4.80 kW | £2,246 | Baseline |
💷 Typical annual saving vs bronze equivalent: £328 – £562
🎯 Real World Examples & Applications
🏨 Hotel & Resort Pools
The Resort 80 excels in hospitality environments with substantial pool volumes. The 80 m³/h flow capacity ensures rapid turnover rates for optimal water quality, while quiet operation (≤70 dB) maintains guest comfort. German engineering guarantees minimal service disruptions during peak seasons.
🏊♂ Municipal Swimming Pools
Public facilities benefit from TÜV-certified safety compliance and robust continuous-duty capability. The complete electrical separation exceeds requirements for public installations, while the oversized 3-litre strainer basket efficiently handles high bather loads with extended maintenance intervals.
🛁 Spa & Water Features
The substantial head capacity (up to 18m) makes the Resort 80 ideal for powering water features, fountains, waterfalls, and massage bath systems. The 60°C maximum water temperature rating enables integration with heated therapeutic installations.
💪 Health Clubs & Fitness Centres
Facilities with extended operating hours appreciate the continuous-duty design and thermal overload protection. The IP55-rated motor withstands demanding environments, while the maintenance-free seal minimises service requirements during busy periods.
🏠 Large Private Estates
Prestigious residential installations with commercial-scale pools benefit from the combination of professional performance and reduced complexity compared to industrial alternatives. The 34kg weight simplifies installation compared to 70-90kg bronze equivalents.
🔄 Commercial Upgrade Projects
Facilities replacing ageing bronze or cast-iron pumps achieve immediate benefits: significant weight reduction (34kg vs 70-90kg for bronze equivalents), simplified installation, and measurable reduction in operating costs without sacrificing flow performance.
💡 Cost Savings Examples
📍 Scenario: Replacing an Ageing High-Capacity Bronze Pump
Many commercial facilities operate traditional bronze pumps installed 15-20 years ago. Here’s the financial case for upgrading to the Resort 80:
| Factor | ❌ Old Bronze Pump (5.5kW) | ✅ Speck Resort 80 (4.80kW) |
|---|---|---|
| Power consumption | 5.5 kW | 4.80 kW |
| Annual hours (seasonal) | 1,800 | 1,800 |
| Energy consumed | 9,900 kWh | 8,640 kWh |
| Annual energy cost | £2,574 | £2,246 |
| 💰 Annual saving | — | £328 |
📈 5-Year Projected Energy Savings: £1,640 📈 10-Year Projected Energy Savings: £3,280
Plus: Elimination of expensive bronze pump seal replacements (typically £500-800 per service for high-capacity units)
📍 Scenario: New Large Commercial Installation
For facilities planning new pool installations requiring high-capacity circulation, the Resort 80 offers significant advantages:
| Cost Factor | ❌ Bronze/Cast Iron | ✅ Speck Resort 80 |
|---|---|---|
| Typical purchase price | £3,500 – £4,500 | Lower investment |
| Installation labour | Higher (70-90kg unit) | Reduced (34kg unit) |
| Annual maintenance | £400-700 (seal services) | Minimal (maintenance-free seal) |
| Annual energy (1,800 hrs) | £2,574+ | £2,246 |
| ⏱ Payback period | — | Immediate |
📍 Scenario: Upgrading from Undersized Equipment
Facilities struggling with inadequate circulation often consider pump upgrades. The Resort 80 vs multiple smaller pumps:
| Configuration | ❌ 2× Smaller Pumps | ✅ Single Resort 80 |
|---|---|---|
| Combined flow rate | ~70-80 m³/h | 80 m³/h |
| Total power consumption | 6.0-7.0 kW | 4.80 kW |
| Annual energy (1,800 hrs) | £2,808 – £3,276 | £2,246 |
| Maintenance points | 4 seals, 2 motors | 1 seal, 1 motor |
| 💷 Annual saving | — | £562 – £1,030 |
📈 3-Year Projected Savings: £1,686 – £3,090
(Based on combined energy savings and reduced maintenance complexity)
📥 Downloads & Resources
Access comprehensive documentation for the Speck BADU Resort 80:
📄 Installation & Operation Manual – Complete multilingual installation guide, safety instructions, maintenance procedures, and troubleshooting (DE/EN/FR/NL/IT/ES)
📄 Technical Datasheet – Detailed specifications, performance curves, dimensional drawings, and electrical data for the complete Resort series
🏆 Why Choose the Speck BADU Resort 80
✅ German Engineering Excellence – Manufactured by Speck Pumpen, Germany’s premier pool pump specialist with decades of commercial expertise and TÜV certification
✅ High-Capacity Performance – 80 m³/h flow rate and up to 18m head capacity handles demanding commercial hydraulic requirements with ease
✅ Exceptional Energy Efficiency – 4.80kW input delivers 80 m³/h output, significantly more efficient than traditional bronze alternatives requiring 5.5kW+
✅ Maintenance-Free Mechanical Seal – The closed bellows carbon/ceramic/NBR design eliminates routine seal maintenance, dramatically reducing total cost of ownership
✅ Complete Corrosion Immunity – Advanced PP GF 30 and PA 66 GF composite construction is unaffected by aggressive pool chemicals or environmental conditions
✅ Commercial Safety Compliance – Complete electrical separation and TÜV Rheinland GS certification ensure compliance with strict public facility regulations
🎯 Why Buy From Parts4Tubs?
✅ Specialist Commercial Pool Expertise – In-depth knowledge of high-capacity commercial systems ensures you receive the optimal pump for your application
✅ Competitive Trade Pricing – Professional rates available for installers, facility managers, and commercial operators
✅ Comprehensive Technical Support – Access to detailed product specifications and installation guidance before, during, and after purchase
✅ Fast UK Delivery – Efficient nationwide dispatch to minimise project delays
✅ Full Manufacturer Warranty – Complete peace of mind with genuine Speck manufacturer backing
✨ Summary
The Speck BADU Resort 80 delivers professional-grade commercial pool circulation for facilities requiring substantial flow capacity without the traditional costs and complexity of bronze or cast-iron equipment. German-engineered to TÜV standards, this 4.00kW three-phase pump provides 80 m³/h flow rates with typical seasonal running costs of £2,246 – representing significant savings versus traditional alternatives. The maintenance-free bellows seal, complete electrical separation, and robust composite construction ensure reliable, safe operation for hotels, wellness centres, health clubs, municipal pools, and prestigious private estates demanding uncompromising commercial performance.

















