💧 Speck BADU Resort 70 3.00kW 3-Phase Commercial Pool Pump
German-Engineered Commercial Circulation Excellence – Delivering Bronze Pump Performance Without the Bronze Price Tag
📋 Product Overview
The Speck BADU Resort 70 represents a revolutionary advancement in commercial pool circulation technology from Germany’s premier pump manufacturer. This powerful 3.00kW (4.0 HP) three-phase pump delivers the substantial flow rates and pressure capabilities previously only achievable through expensive, heavy bronze or cast-iron pumps – but at a fraction of the weight and cost.
Engineered with advanced reinforced fibreglass plastic construction, the Resort 70 provides complete corrosion immunity, maintenance-free mechanical sealing, and German TÜV-certified safety. The innovative design ensures complete electrical separation between the motor shaft and pool water, exceeding commercial safety standards while the oversized integrated strainer basket dramatically reduces maintenance frequency in demanding commercial environments.
Ideal for pools ranging from 300-400 cubic metres, this pump delivers reliable continuous-duty performance for hotels, wellness centres, municipal facilities, and large residential installations requiring commercial-grade circulation.
⭐ Key Features
✅ 3.00kW (4.0 HP) Three-Phase Power – Robust motor configuration delivering approximately 2840 RPM for substantial flow rates suitable for pools up to 400m³
✅ Advanced Self-Priming Technology – Install up to 3 metres above water level without performance compromise, enabling flexible equipment room positioning
✅ Maintenance-Free Closed Bellows Mechanical Seal – Eliminates routine seal maintenance, significantly reducing long-term operational costs and downtime
✅ Complete Electrical Separation – Motor/pump shaft has no contact with pool water, exceeding stringent commercial safety requirements for public installations
✅ Oversized Integrated Strainer Basket – Extended cleaning intervals reduce maintenance frequency, critical for busy commercial facilities
✅ Premium Reinforced Fibreglass Construction – Complete corrosion immunity against aggressive pool chemicals and environmental conditions
✅ TÜV Rheinland GS Certified – German safety certification to EN 60335-1 standards, ensuring compliance with strict commercial regulations
✅ 90mm Metric Union Connections – Seamless integration with commercial-grade plumbing systems, optimised for enhanced flow characteristics
✅ IP55 Motor Protection Rating – Designed for demanding continuous operation with thermal overload protection in commercial environments
✅ Compact Monoblock Design – Space-saving integrated construction eliminates multiple failure points while reducing installation complexity
🔧 Technical Specifications
| Specification | Details |
|---|---|
| Model | Speck BADU Resort 70 |
| Power Output (P2) | 3.00 kW (4.0 HP) |
| Power Input (P1) | 3.80 kW |
| Phase Configuration | 3-Phase |
| Voltage | 400/230V (Y/Δ Connection) |
| Rated Current | 6.20/10.70 A (Y/Δ) |
| Motor Speed | Approximately 2840 RPM |
| Recommended Pool Size | 300-400 m³ |
| Maximum Water Temperature | 60°C |
| Maximum Casing Pressure | 2.5 bar |
| Installation Range | Up to 3m above or below water level |
| Inlet/Outlet Connection | 110/110 mm |
| Supplied Unions | 90mm Metric |
| Motor Protection | IP55 with Thermal Overload |
| Insulation Class | Class F |
| Continuous Sound Level | ≤70 dB(A) |
| Weight | 29 kg |
| Pump Length | 837 mm |
| Safety Certification | TÜV Rheinland GS (EN 60335-1) |
| SKU | 1482241072 |
💰 Usage Costs & Running Expenses
📊 Annual Running Cost Calculation
Understanding the true cost of ownership is essential when investing in commercial pool equipment. Here’s a detailed breakdown of the Resort 70’s operating costs:
Base Power Consumption:
- Power Input (P1): 3.80 kW
- UK Commercial Electricity Rate: £0.26 per kWh (November 2025 average)
🏊 Scenario 1: Seasonal Commercial Pool (Hotel/Leisure Centre)
Usage Pattern: 10 hours per day, 6 months (180 days)
| Calculation Component | Value |
|---|---|
| Daily running hours | 10 hours |
| Operating season | 180 days |
| Annual running hours | 1,800 hours |
| Power consumption | 3.80 kW |
| Energy consumed | 6,840 kWh |
| ✅ Annual running cost | £1,778.40 |
Monthly cost during operation: £296.40
♨ Scenario 2: Year-Round Commercial Operation (Wellness Centre/Municipal Pool)
Usage Pattern: 12 hours per day, 365 days
| Calculation Component | Value |
|---|---|
| Daily running hours | 12 hours |
| Operating days | 365 days |
| Annual running hours | 4,380 hours |
| Power consumption | 3.80 kW |
| Energy consumed | 16,644 kWh |
| ✅ Annual running cost | £4,327.44 |
Monthly cost: £360.62
🏠 Scenario 3: Extended Residential/Small Commercial Use
Usage Pattern: 8 hours per day, 7 months (210 days)
| Calculation Component | Value |
|---|---|
| Daily running hours | 8 hours |
| Operating season | 210 days |
| Annual running hours | 1,680 hours |
| Power consumption | 3.80 kW |
| Energy consumed | 6,384 kWh |
| ✅ Annual running cost | £1,659.84 |
Monthly cost during operation: £237.12
⚡ Energy Efficiency Comparison
The Resort 70’s advanced engineering delivers exceptional value when compared to traditional alternatives:
| Pump Type | Typical Power | Annual Cost (1,800 hrs) | Difference |
|---|---|---|---|
| ❌ Traditional Bronze Pump | 4.5-5.0 kW | £2,106 – £2,340 | +£328 to +£562 |
| ❌ Cast Iron Norm Pump | 4.2-4.8 kW | £1,965 – £2,246 | +£187 to +£468 |
| ✅ Speck Resort 70 | 3.80 kW | £1,778 | Baseline |
🎯 Real World Examples & Applications
🏢 Premium Hotels & Resorts
The Resort 70 is ideally suited for upscale hospitality facilities with pools in the 300-400m³ range. The quiet operation (≤70 dB) ensures guest comfort while the reliable German engineering guarantees minimal service disruptions during peak seasons.
🏊♂ Municipal Swimming Pools
Public facilities benefit from the TÜV-certified safety compliance and robust continuous-duty capability. The complete electrical separation exceeds requirements for public installations, while the large strainer basket handles high bather loads efficiently.
🛁 Large Health & Wellness Centres
Spa facilities with substantial circulation requirements appreciate the 60°C maximum water temperature rating, enabling integration with heated therapeutic pools and hydrotherapy installations.
🏫 Educational Institutions
Schools and universities with competitive swimming programmes require dependable, efficient circulation. The Resort 70 delivers reliable performance with straightforward maintenance requirements suitable for facility management teams.
🔄 Commercial Upgrade Projects
Facilities replacing ageing bronze or cast-iron pumps benefit from the significant weight reduction (29kg vs 60-80kg for bronze equivalents), simpler installation, and immediate reduction in operating costs without sacrificing performance.
💡 Cost Savings Examples
📍 Scenario: Replacing an Ageing Bronze Pump
Many commercial facilities are operating with traditional bronze pumps installed 15-20 years ago. Here’s the financial case for upgrading:
| Factor | ❌ Old Bronze Pump (4.5kW) | ✅ Speck Resort 70 (3.80kW) |
|---|---|---|
| Power consumption | 4.5 kW | 3.80 kW |
| Annual hours (seasonal) | 1,800 | 1,800 |
| Energy consumed | 8,100 kWh | 6,840 kWh |
| Annual energy cost | £2,106 | £1,778 |
| 💰 Annual saving | — | £328 |
📈 5-Year Projected Savings: £1,640 📈 10-Year Projected Savings: £3,280
Plus: Elimination of expensive bronze pump seal replacements (typically £400-600 per service)
📍 Scenario: New Commercial Installation vs Traditional Options
For facilities planning new pool installations, the Resort 70 offers significant upfront and ongoing savings:
| Cost Factor | ❌ Bronze/Cast Iron | ✅ Speck Resort 70 |
|---|---|---|
| Typical purchase price | £2,800 – £3,500 | Lower investment |
| Installation labour | Higher (60-80kg unit) | Reduced (29kg unit) |
| Annual maintenance | £300-500 (seal services) | Minimal (maintenance-free seal) |
| Annual energy (1,800 hrs) | £2,100+ | £1,778 |
| ⏱ Payback period | — | Immediate |
📍 Scenario: Upgrading from Single-Phase to Three-Phase
Commercial facilities transitioning from overworked single-phase pumps to proper three-phase equipment:
| Benefit | Value |
|---|---|
| Reduced motor stress | Extended equipment lifespan |
| Lower current draw | Reduced electrical infrastructure strain |
| Improved efficiency | Lower operating costs |
| Continuous duty rating | 24/7 operation capability |
| 💷 Typical 3-year total savings | £800 – £1,200 |
(Based on combined energy savings and avoided premature replacement costs)
📥 Downloads & Resources
Access comprehensive documentation for the Speck BADU Resort 70:
📄 Installation & Operation Manual – Complete multilingual installation guide, safety instructions, maintenance procedures, and troubleshooting (DE/EN/FR/NL/IT/ES)
📄 Technical Datasheet – Detailed specifications, performance curves, dimensional drawings, and electrical data for the complete Resort series
🏆 Why Choose the Speck BADU Resort 70
✅ German Engineering Excellence – Manufactured by Speck Pumpen, Germany’s leading pool pump specialist with decades of commercial expertise
✅ Bronze Pump Performance, Plastic Pump Price – Access flow rates and pressure capabilities previously requiring expensive heavy-duty pumps at a fraction of the investment
✅ Maintenance-Free Mechanical Seal – The closed bellows design eliminates routine seal maintenance, dramatically reducing total cost of ownership
✅ Complete Corrosion Immunity – Advanced reinforced fibreglass construction is unaffected by aggressive pool chemicals or environmental conditions
✅ Certified Commercial Safety – TÜV Rheinland GS certification ensures compliance with strict public facility regulations and insurance requirements
✅ Future-Proof Investment – Robust construction and standard commercial interfaces ensure compatibility with evolving pool technologies and regulations
🛒 Why Buy From Parts4Tubs?
✅ Specialist Pool Equipment Expertise – Dedicated knowledge of commercial and domestic pool systems ensures you receive the right pump for your application
✅ Competitive Commercial Pricing – Trade and bulk pricing available for installers and facility managers
✅ Comprehensive Technical Support – Access to detailed product knowledge and installation guidance before, during, and after purchase
✅ Fast UK Delivery – Efficient dispatch to get your equipment on-site when you need it
✅ Full Manufacturer Warranty – Complete peace of mind with genuine Speck manufacturer backing
✨ Summary
The Speck BADU Resort 70 represents the optimal solution for commercial pool facilities requiring substantial circulation capacity without the traditional costs and complications of bronze or cast-iron equipment. German-engineered precision, TÜV-certified safety, and maintenance-free operation combine to deliver exceptional long-term value with typical annual running costs of £1,778 for seasonal commercial use. Whether upgrading ageing infrastructure or specifying for new installations, this 3.00kW three-phase pump provides the performance, reliability, and efficiency that discerning commercial operators demand.

















