💧 Speck BADU EasyFit 29 – 1.30 kW Three-Phase Commercial Pool Pump
Industrial-Grade German Engineering: Built for Continuous Commercial Operation
📋 Product Overview
The Speck BADU EasyFit 29 Three-Phase is an industrial-grade circulation pump engineered specifically for commercial pools, aquatic centres, and high-demand installations. Delivering 1.30 kW of robust output through a three-phase 400V motor, this pump is designed for environments where continuous, trouble-free operation isn’t optional – it’s essential.
Three-phase motors offer significant advantages over their single-phase counterparts in commercial settings: smoother running characteristics, lower starting currents, reduced vibration, and enhanced energy efficiency during extended operation. The EasyFit 29 3-Phase harnesses these benefits whilst maintaining the revolutionary installation flexibility that has made the EasyFit series “the champion of flexibility” among pool professionals.
With six comprehensive connection sets providing direct compatibility with pumps from Pentair, Hayward, Sta-Rite, Astral, Wilo, and other major manufacturers, the EasyFit 29 3-Phase transforms what was once a complex commercial retrofit into a straightforward drop-in replacement. German engineering excellence meets practical installation simplicity.
⭐ Key Features
✅ Three-Phase 400V Motor – Industrial-grade electrical design delivers smoother operation, lower starting currents, and superior energy efficiency for continuous commercial use
✅ Powerful 1.30 kW Output – Robust circulation capability for commercial pools, aquatic centres, and larger residential installations requiring enhanced water movement
✅ Universal Compatibility System – Six comprehensive connection sets enable direct replacement of pumps from Pentair, Hayward, Sta-Rite, Astral, Wilo, and other manufacturers without plumbing modifications
✅ Enhanced Energy Efficiency – Three-phase design draws just 1.65 kW input for 1.30 kW output, delivering superior efficiency compared to equivalent single-phase motors
✅ Self-Priming Capability – Integrated 3-litre strainer tank enables reliable priming up to 3 metres above water level, accommodating challenging plant room configurations
✅ Complete Electrical Separation – Motor/pump shaft has zero contact with pool water, providing enhanced safety and extended motor lifespan in demanding commercial environments
✅ Height-Adjustable Pump Feet – Enables precise alignment with existing pipework, dramatically reducing installation time and labour costs on commercial retrofits
✅ Bellows-Type Mechanical Seal – Premium seal mounted on plastic shaft protector sleeve provides exceptional protection against water infiltration under continuous operation
✅ Reduced Weight Design – At 16.7 kg (lighter than the single-phase equivalent), the 3-phase model offers easier handling during installation
✅ Maximum Head of 17 Metres – Ample pressure capacity for commercial installations with complex pipework runs, water features, or elevated equipment positions
🔧 Technical Specifications
| Specification | Detail |
|---|---|
| Model | Speck BADU EasyFit 29 |
| Article Number | 207.6320.037 |
| SKU | 1482241329 |
| Power Input (P1) | 1.65 kW |
| Power Output (P2) | 1.30 kW |
| Voltage | 3~ Y/Δ 400/230V (Three Phase) |
| Rated Current (Y/Δ) | 3.20 A / 5.54 A |
| Maximum Head (Hmax) | 17.0 metres |
| Suitable Pool Volume | Up to 210 m³ |
| Flow Rate Range | 9–45 m³/h |
| Motor Speed | 2840 rpm |
| Inlet Connection (Sa) | 63 mm |
| Outlet Connection (Da) | 63 mm |
| Recommended Suction Pipe | 75 mm |
| Recommended Discharge Pipe | 63 mm |
| Maximum Pump Length | 597 mm |
| Weight | 16.7 kg |
| Strainer Tank Capacity | Approx. 3 litres |
| Strainer Basket Mesh Size | 3.2 x 2.6 mm |
| Seal Type | Bellows-type mechanical seal |
| Shaft Protection | Plastic protector sleeve |
| Maximum Water Temperature | 40°C (60°C capable) |
| Max Installation Height | 3 metres above/below water level |
| IP Protection Rating | IP55 |
| Insulation Class | Class F |
| Maximum System Pressure | 2.5 bar |
| Sound Pressure Level | 64.0 dB(A) at 1m |
| Sound Power Level | 72 dB(A) |
Materials Construction
| Component | Material |
|---|---|
| Pump Casing | PP GF 30 |
| Intermediate Housing | PP GF 30 |
| Gland Housing | PP TV 40 |
| Diffuser | PA 66 GF 30 / PP TV 40 / PP GF 30 |
| Impeller | PPE GF 30 / PP GF 30 |
| Strainer Basket | PP |
| Lid | PC (transparent) / PP GF 30 |
| Glue Sockets | ABS |
| Mechanical Seal | Carbon / Ceramic / NBR |
| Screws | Stainless Steel |
| Elastomers | NBR / Viton |
Three-Phase vs Single-Phase Comparison
| Parameter | 3-Phase (This Model) | 1-Phase Equivalent |
|---|---|---|
| Power Input | 1.65 kW | 1.70 kW |
| Power Output | 1.30 kW | 1.30 kW |
| Efficiency | 78.8% | 76.5% |
| Weight | 16.7 kg | 17.5 kg |
| Starting Current | Lower (soft start capable) | Higher inrush |
| Vibration | Reduced | Standard |
💰 Usage Costs & Running Expenses
Three-phase motors offer inherent efficiency advantages, and the EasyFit 29 3-Phase capitalises on this with a lower power input (1.65 kW) compared to the single-phase model (1.70 kW) for identical output. Here’s a detailed breakdown of running costs for commercial applications.
📊 Annual Running Cost Calculation
Energy Rate Used: £0.2635 per kWh (UK Energy Price Cap, October-December 2025)
Power Input: 1.65 kW
Note: Commercial premises may pay different rates. Large users on half-hourly metering typically pay £0.20-£0.28 per kWh depending on contract terms.
🏢 Scenario 1: Commercial Pool – Standard Operation
- Daily Operation: 10 hours/day
- Operating Days: 365 days (year-round)
- Annual Running Hours: 10 × 365 = 3,650 hours
Calculation:
- Energy Consumption: 1.65 kW × 3,650 hours = 6,022.5 kWh/year
- ✅ Annual Running Cost: 6,022.5 × £0.2635 = £1,586.93
🏊 Scenario 2: Hotel/Leisure Centre – Extended Hours
- Daily Operation: 14 hours/day
- Operating Days: 365 days (year-round)
- Annual Running Hours: 14 × 365 = 5,110 hours
Calculation:
- Energy Consumption: 1.65 kW × 5,110 hours = 8,431.5 kWh/year
- ✅ Annual Running Cost: 8,431.5 × £0.2635 = £2,221.70
♨️ Scenario 3: Aquatic Centre – Maximum Operation
- Daily Operation: 16 hours/day
- Operating Days: 365 days (year-round)
- Annual Running Hours: 16 × 365 = 5,840 hours
Calculation:
- Energy Consumption: 1.65 kW × 5,840 hours = 9,636 kWh/year
- ✅ Annual Running Cost: 9,636 × £0.2635 = £2,539.09convergent
⚡ Three-Phase Efficiency Advantage
The 3-phase EasyFit 29 draws 1.65 kW versus 1.70 kW for the single-phase model – a 3% reduction in power consumption for identical output. Here’s what that means over time:
| Operating Hours/Year | Single-Phase Cost | Three-Phase Cost | Annual Saving |
|---|---|---|---|
| 3,650 hrs (commercial) | £1,635.89 | £1,586.93 | 💵 £48.96 |
| 5,110 hrs (extended) | £2,290.18 | £2,221.70 | 💵 £68.48 |
| 5,840 hrs (maximum) | £2,618.10 | £2,539.09 | 💵 £79.01 |
📈 5-Year Saving (Extended Operation): £342.40 – purely from the three-phase efficiency advantage
📈 Cost Comparison vs. Older Commercial Pumps
Many older commercial pumps operate at 2.0-2.5 kW input for similar output. The efficiency gains are substantial:
| Pump Type | Power Input | Annual kWh (5,110 hrs) | Annual Cost | Difference |
|---|---|---|---|---|
| ✅ Speck EasyFit 29 3-Phase | 1.65 kW | 8,431.5 kWh | £2,221.70 | — |
| ❌ Typical Older 3-Phase (2.0 kW) | 2.00 kW | 10,220 kWh | £2,692.97 | +£471.27 |
| ❌ Inefficient 3-Phase (2.5 kW) | 2.50 kW | 12,775 kWh | £3,366.21 | +£1,144.51 |
💷 Potential Annual Savings: £471 – £1,144 compared to older commercial equipment
🎯 Real World Examples & Applications
🏢 Hotels & Leisure Centres
The EasyFit 29 3-Phase excels in hospitality environments where reliability is paramount and downtime unacceptable. The smooth three-phase operation minimises vibration and noise, whilst the robust construction handles the extended running hours typical of hotel pool facilities.
Typical Installation: 4-star hotels with indoor pools, boutique spa hotels, resort swimming facilities requiring 12-16 hour daily operation.
🏊♂️ Aquatic Centres & Swimming Clubs
For swimming clubs and community aquatic centres, the EasyFit 29 delivers commercial-grade performance with lower running costs than older equivalent equipment. The self-priming capability ensures reliable restarts after maintenance shutdowns.
Typical Installation: Local authority swimming pools, sports club facilities, school swimming pools, and training centres with multiple daily sessions.
🛁 Commercial Spa & Wellness Facilities
Day spas, wellness centres, and hydrotherapy facilities benefit from the EasyFit 29’s ability to handle water temperatures up to 60°C. The complete electrical separation provides enhanced safety assurance in environments where water and people interact closely.
Typical Installation: Spa resorts, hydrotherapy centres, rehabilitation facilities, and luxury wellness retreats.
🔄 Commercial Retrofit Projects
The six connection sets make the EasyFit 29 3-Phase the ideal choice for commercial pump replacement projects. Direct compatibility means minimal downtime – critical for facilities where every day of closure impacts revenue.
Compatible Replacement For:
- Pentair Ultra-Flow® – Connection Set 1
- Pentair WhisperFlo® – Connection Set 2
- Hayward Super Pump® – Connection Set 3
- Sta-Rite 5P2R – Connection Set 4
- Astral Super Sprint / Victoria Plus / Wilo Filtec FBS – Connection Set 5
- Sta-Rite 5MPR (Dyna-Glas™) – Connection Set 6
🏠 Luxury Residential Installations
For high-end residential pools where three-phase power is available, the EasyFit 29 3-Phase offers smoother, quieter operation than single-phase alternatives. Ideal for larger residential pools, especially those with water features or complex filtration systems.
Typical Installation: Executive homes with pools 100m³+, properties with existing three-phase supply, and installations where reduced noise and vibration are priorities.
💡 Cost Savings Examples
📍 Scenario: Hotel Pool Pump Replacement
Situation: A 60-room hotel replacing a 15-year-old three-phase pump that has become increasingly unreliable and inefficient.
Before (Old 3-Phase Pump):
- ❌ Power Input: 2.2 kW
- ❌ Annual Running Hours: 5,110 (extended commercial)
- ❌ Annual Energy: 11,242 kWh
- ❌ Annual Cost: £2,962.27
After (Speck EasyFit 29 3-Phase):
- ✅ Power Input: 1.65 kW
- ✅ Annual Running Hours: 5,110
- ✅ Annual Energy: 8,431.5 kWh
- ✅ Annual Cost: £2,221.70
💰 Annual Saving: £740.57 📈 5-Year Saving: £3,702.85 ⏱️ Payback Period: Pump upgrade pays for itself through energy savings within 12-18 months
📍 Scenario: Leisure Centre Multiple Pump Upgrade
Situation: Local authority leisure centre upgrading four ageing circulation pumps to improve efficiency and reduce maintenance costs.
Before (4× Old 2.5 kW 3-Phase Pumps):
- ❌ Combined Power Input: 10.0 kW
- ❌ Annual Running Hours: 5,840 (maximum commercial)
- ❌ Annual Energy: 58,400 kWh
- ❌ Annual Cost: £15,388.40
After (4× Speck EasyFit 29 3-Phase):
- ✅ Combined Power Input: 6.6 kW
- ✅ Annual Running Hours: 5,840
- ✅ Annual Energy: 38,544 kWh
- ✅ Annual Cost: £10,156.34
💷 Annual Saving: £5,232.06 📈 5-Year Saving: £26,160.30 ⏱️ ROI: Complete payback within first year, substantial ongoing savings thereafter
📍 Scenario: Quick Retrofit – Pentair WhisperFlo Replacement
Situation: Commercial pool contractor urgently replacing a failed Pentair WhisperFlo 3-phase pump during peak season.
Traditional Replacement Approach:
- ❌ Source exact Pentair replacement: Extended lead time
- ❌ Potential plumbing modifications: £200-400
- ❌ Extended downtime: Lost revenue
- ❌ Total disruption: 3-5 days
EasyFit 29 3-Phase Solution:
- ✅ In-stock availability from Parts4Tubs
- ✅ Connection Set 2 provides direct WhisperFlo compatibility
- ✅ Drop-in installation – no plumbing changes
- ✅ Total downtime: Same day
💵 Saved: £200-400 in plumbing costs + avoided revenue loss from extended closure
📥 Downloads & Resources
📄 Speck BADU EasyFit Technical Datasheet – Complete technical specifications, performance curves, dimensional drawings, connection set details, and multi-language documentation (PDF)
📄 Speck BADU EasyFit Product Brochure – Product overview, connection set compatibility chart, ordering information, and application guidance (PDF)
🏆 Why Choose the Speck BADU EasyFit 29 Three-Phase?
✅ Purpose-Built for Commercial Use – Three-phase 400V motor design delivers smoother operation, lower starting currents, and enhanced reliability for continuous commercial operation
✅ Superior Energy Efficiency – 1.65 kW input for 1.30 kW output represents class-leading efficiency, reducing operating costs throughout the pump’s lifetime
✅ Universal Retrofit Capability – Six connection sets enable direct replacement of Pentair, Hayward, Sta-Rite, Astral, and Wilo pumps without costly plumbing modifications
✅ Minimise Downtime – Drop-in replacement capability means faster installation and reduced disruption to commercial operations
✅ German Engineering Quality – Manufactured by Speck Pumpen with full EU regulatory compliance including CE, EMC, RoHS, WEEE, and Ecodesign directives
✅ Complete Electrical Separation – Zero contact between motor shaft and pool water provides enhanced safety for commercial environments with public access
🎯 Why Buy From Parts4Tubs?
✅ Commercial Equipment Specialists – We understand the demands of commercial pool environments and can provide expert guidance on specification and compatibility
✅ Genuine Speck Products – All pumps supplied are genuine Speck products with full manufacturer warranty and comprehensive documentation
✅ Competitive Trade Pricing – Excellent value on premium German-engineered equipment for commercial operators and pool professionals
✅ Fast UK Delivery – We understand that commercial downtime costs money – quick dispatch to minimise disruption
✅ Technical Support – Our team can assist with connection set selection, electrical requirements, and installation queries
✅ Complete Documentation – Full technical datasheets, manuals, performance curves, and compliance certificates provided
✨ Summary
The Speck BADU EasyFit 29 Three-Phase represents the optimal choice for commercial pool operators, leisure facilities, and high-end residential installations requiring industrial-grade performance and reliability. The three-phase design delivers inherent advantages in efficiency, smooth operation, and longevity – precisely what demanding commercial environments require.
With six connection sets providing universal retrofit capability, the EasyFit 29 3-Phase eliminates the traditional complexities of commercial pump replacement. Whether upgrading ageing equipment in a hotel, leisure centre, or aquatic facility, this pump drops directly into existing systems from virtually any manufacturer – no plumbing modifications, no extended downtime, no complications.
German engineering excellence, proven reliability, lower running costs, and unmatched installation flexibility make the Speck BADU EasyFit 29 Three-Phase the professional’s choice for commercial pool circulation.
Specify the Speck BADU EasyFit 29 3-Phase – where commercial performance meets installation simplicity.

















