Calpeda Conversion Kit for Granudos 45 Systems
Product Overview
As a retailer of hot tub spare parts, I’m offering this specialized Calpeda conversion kit engineered specifically for Granudos 45 systems. This comprehensive 8-kilogram package includes both the high-capacity pump and complete pipework assembly required for professional system conversion.
Kit Contents
- Heavy-duty Calpeda pump unit
- Complete pipework assembly
- Industrial-grade fittings and connections
- Full mounting hardware
- Conversion components
Key Features
- Specifically designed for Granudos 45 capacity
- Professional-grade 8kg complete system
- Enhanced flow capacity for larger operations
- Industrial-strength components
- Optimized for high-volume applications
- Full system compatibility
Technical Applications
This conversion kit is engineered for:
- Granudos 45 dosing systems
- High-capacity chemical feeding
- Commercial-grade installations
- System modernization projects
- Performance upgrades
Specifications Table
Specification | Detail |
---|---|
Compatibility | Granudos 45 Systems |
Total Weight | 8 Kilograms |
Manufacturer | Calpeda |
Kit Type | Complete Conversion |
Components | Pump and Full Pipework |
Application | High-Capacity Chemical Dosing |
Installation Type | Direct Replacement/Upgrade |
Material | Industrial-Grade Components |
System Type | Chemical Feed/Dosing |
Installation Benefits
- Complete system solution
- Matched components
- Optimized flow dynamics
- Professional-grade reliability
- Simplified upgrade process
System Integration
Engineered for seamless integration with:
- Existing Granudos 45 systems
- High-capacity dosing setups
- Commercial pool installations
- Advanced water treatment systems
Performance Features
- High-capacity flow rates
- Enhanced system efficiency
- Industrial-grade durability
- Consistent chemical delivery
- Optimized pressure control
Technical Considerations
- Designed for professional installation
- Compatible with standard connections
- Built for continuous operation
- Engineered for chemical resistance
- Optimized for high-volume processing
Maintenance Information
System maintenance should include regular:
- Connection inspections
- Pressure monitoring
- Flow rate verification
- Component assessment
- System efficiency checks
Note: Installation should be performed by qualified professionals in accordance with manufacturer specifications and local regulations