Etatron DLX MA/AD Wall Mounted Dosing Pump
Product Overview
As a retailer of hot tub spare parts and equipment, I’m offering this high-pressure Etatron DLX MA/AD manual control dosing pump, featuring wall-mounted design with PVDF/FPM construction and precise 5L/hr flow rate capability at 7 Bar pressure.
Key Features
- 5L/hr maximum flow rate
- High-pressure 7 Bar capacity
- PVDF/FPM construction
- Manual precision control
- Wall-mounted configuration
- Space-efficient design
Technical Specifications
Specification | Detail |
---|---|
Model | Etatron DLX MA/AD |
Flow Rate | 5 L/hr |
Pressure | 7 Bar |
Material | PVDF/FPM |
Mounting | Wall Mounted |
Control Type | Manual |
Construction | Chemical Resistant |
Application | High-Pressure Dosing |
Performance Features
- High-pressure capability
- Precise flow regulation
- Accurate dosing control
- Pressure stability
- Consistent delivery
- Vertical installation efficiency
Design Elements
- Professional wall mounting
- PVDF/FPM chemical resistance
- Accessible control panel
- Compact vertical design
- High-pressure fittings
- Space-saving profile
Installation Benefits
- Optimized wall mounting
- Convenient access
- Minimal footprint
- Vertical optimization
- Easy maintenance access
- Professional appearance
Technical Applications
Ideal for:
- High-pressure chemical dosing
- Precise chemical injection
- Water treatment systems
- pH control applications
- Sanitizer delivery
- Space-restricted installations
Control Features
- Manual flow adjustment
- Precise rate settings
- Intuitive operation
- Status indicators
- Stroke control
- Speed regulation
Maintenance Information
- Accessible servicing
- Regular calibration checks
- Seal integrity inspection
- Performance monitoring
- Mount security verification
- Pressure system checks
Operating Parameters
- Maximum flow: 5L/hr
- Operating pressure: 7 Bar
- Material compatibility: PVDF/FPM
- Power: Standard connection
- Installation: Wall-mounted
- Control: Manual adjustment
Installation Guidelines
- Sturdy wall mounting required
- Level installation critical
- Proper power supply
- High-pressure plumbing setup
- System pressure testing
- Operation verification
Note: Professional installation recommended to ensure proper wall mounting and system integrity, particularly given the high-pressure operation